Electric Vehicle Charging Stations for RIIO-ED2 Project (Hardware)
• NATIONAL GRID ELECTRICITY DISTRIBUTION PLC
F04: Periodic indicative notice – utilities (call for competition)
Notice reference: 2023/S 000-000302
Published 5 January 2023, 4:23pm
Contents
one. Contracting entityI. Contracting entityPress escape key to exit
two. Object II. Object
four. ProcedureIV. Procedure
six. Complementary informationVI. Complementary information
Section one: Contracting entitySection I: Contracting entity
one.1) Name and addressesI.1) Name and addresses
NATIONAL GRID ELECTRICITY DISTRIBUTION PLC
AVONBANK, FEEDER ROAD
BRISTOL
BS2 0TB
Contact
John Gould
Email
Telephone
+44 01179332087
Country
United Kingdom
If you want help with winning this tender, then take a look at our Tender Writing page.
NUTS code
UK – United Kingdom
Companies House
02366894
Internet address(es)
Main address
www.nationalgrid.co.uk
one.3) CommunicationI.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at
www.nationalgrid.co.uk
Additional information can be obtained from the above-mentioned address
Tenders or requests to participate must be submitted electronically via
www.nationalgrid.co.uk
one.6) Main activityI.6) Main activity
Electricity
Section two: ObjectSection II: Object
two.1) Scope of the procurementII.1) Scope of the procurement
two.1.1) TitleII.1.1) Title
Electric Vehicle Charging Stations for RIIO-ED2 Project (Hardware)
two.1.2) Main CPV codeII.1.2) Main CPV code
• 34144900 – Electric vehicles
two.1.3) Type of contractII.1.3) Type of contract
Supplies
two.1.4) Short descriptionII.1.4) Short description
Please email for the Pre-Qualification Questionnaire (PQQ) document in order to participate in this tender procurement opportunity:
National Grid Electricity Distribution (NGED) are planning to construct an extensive EV charging network of sites across the 4 DNO regions throughout the RIIO-ED2 regulatory period (2023 – 2028). These charging sites are to be located in Primary Substation Sites (PSS’s) greater than 6.6kV up to Bulk Supply Sites (BSP’s) up to 132kV.
NGED has finalised the following Project Prioritisation plan for this:
• Tier 1 Sites
– 83 x 100kW DC Rapid chargers @ PSS sites & 11 x 22kW AC Fast chargers @ BSP sites
• Tier 2 Sites
– 33 x 40kW Mobile DC Rapid chargers @ Transport sites & 81 x 22kW AC Fast chargers @ PSS sites
• Tier 3 Sites
– 90 x 7.2kW AC Fast chargers @ Depot sites
Tier 1 sites will be the highest priority of the project and will command the majority of the project budget. These will consist of the install of EV charging units at 94 sites across all four licence areas of NGED, based upon:
– 83 x Rapid / DC charging units – 100kW output, 2 bays per unit, located at key Primary Substation Sites and Bulk Supply Points, with 1 unit per site
– 11 x Fast / AC charging units – 22kW output, 2 bays per unit, located at key Bulk Supply Points, with 1 unit per site
NGED are ambitious in their plans for delivery of the project, and are aiming to have Tier 1 rolled out and completed between April 2023 and April 2024.
two.1.6) Information about lotsII.1.6) Information about lots
This contract is divided into lots: No
two.2) DescriptionII.2) Description
two.2.3) Place of performanceII.2.3) Place of performance
NUTS codes
• UK – United Kingdom
two.2.4) Description of the procurementII.2.4) Description of the procurement
Please email for the Pre-Qualification Questionnaire (PQQ) document in order to participate in this tender procurement opportunity:
National Grid Electricity Distribution (NGED) are planning to construct an extensive EV charging network of sites across the 4 DNO regions throughout the RIIO-ED2 regulatory period (2023 – 2028). These charging sites are to be located in Primary Substation Sites (PSS’s) greater than 6.6kV up to Bulk Supply Sites (BSP’s) up to 132kV.
NGED has finalised the following Project Prioritisation plan for this:
• Tier 1 Sites
– 83 x 100kW DC Rapid chargers @ PSS sites & 11 x 22kW AC Fast chargers @ BSP sites
• Tier 2 Sites
– 33 x 40kW Mobile DC Rapid chargers @ Transport sites & 81 x 22kW AC Fast chargers @ PSS sites
• Tier 3 Sites
– 90 x 7.2kW AC Fast chargers @ Depot sites
Tier 1 sites will be the highest priority of the project and will command the majority of the project budget. These will consist of the install of EV charging units at 94 sites across all four licence areas of NGED, based upon:
– 83 x Rapid / DC charging units – 100kW output, 2 bays per unit, located at key Primary Substation Sites and Bulk Supply Points, with 1 unit per site
– 11 x Fast / AC charging units – 22kW output, 2 bays per unit, located at key Bulk Supply Points, with 1 unit per site
NGED are ambitious in their plans for delivery of the project, and are aiming to have Tier 1 rolled out and completed between April 2023 and April 2024.
Section four. ProcedureSection IV. Procedure
four.1) DescriptionIV.1) Description
four.1.1) Type of procedureIV.1.1) Type of procedure
Negotiated procedure with prior call for competition
four.1.8) Information about the Government Procurement Agreement (GPA)IV.1.8) Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: Yes
four.2) Administrative informationIV.2) Administrative information
four.2.2) Time limit for the receipt of applications for an invitation to tender or to negotiateIV.2.2) Time limit for the receipt of applications for an invitation to tender or to negotiate
Date
6 February 2023
Local time
5:00pm
four.2.4) Languages in which tenders or requests to participate may be submittedIV.2.4) Languages in which tenders or requests to participate may be submitted
English
Section six. Complementary informationSection VI. Complementary information
six.4) Procedures for reviewVI.4) Procedures for review
six.4.1) Review bodyVI.4.1) Review body
High Court of England & Wales
London
Country
United Kingdom